Frigg Decommissioning

We acted as Marine Manager for SBS Logistics and AKER at the SBS Greenhead Base in Lerwick for the reception of the Frigg MSF Module onboard the S600 barge.

This involved advising on the mooring layout and design to enable the S600 barge to be moored, end on to the jetty for load in of the 9,000 tonne MSF Module in a very restricted and strong tidal area.