Langeled Gas Pipeline

We represented BP's interest in the Rough Gas Field by monitoring operations on board cutter suction dredger 'JFJ De Nul' during dredging operations.

The work involved dredging a channel (160m wide x 8.3m deep) at Easington, Yorkshire to facilitate landing the 44" gas pipeline from the Ormen Lange Gas Field off northern Norway.